公司拥有一个3万平方米的专业模块化预制小屋生产车间,拥有102名员工。年产能为9000套各类露营小屋和预制小屋。工厂拥有完善高效的预制小屋生产线,采用行业最先进的制造工艺
了解更多
30000平方米
厂房宽敞,生产充足。
102+
专业团队,全方位支持。
9000+
规模化生产能力
120百万
市场竞争力强
工程设计能力
制造能力
质量控制能力
2026-11-20
Low-Voltage Power Distribution Design for Data Center E-Houses
Quick answer: A reliable low-voltage power distribution design for a data center E-House should separate critical and non-critical loads, provide clear A and B power paths, use correctly rated LV switchgear, and allow safe maintenance without shutting down the data hall. A modular power distribution layout can shorten site work and improve quality control. The design should also coordinate
2026-11-19
How Modular E-Houses Help Reduce Data Center Construction Labor Requirements
Building a data center often creates a labor problem before it creates a power problem. Prefabricated Electrical Enclosures, modular E-House construction, and off-site power distribution can move repetitive electrical work from a crowded jobsite to a controlled factory. This can reduce site activities such as cable termination, busbar installation, enclosure assembly, and testing, although the
2026-11-18
Data Center E-House Solutions for AI and High-Density Computing Facilities
Data center E-House solutions help AI and high-density computing facilities manage fast power growth, limited construction time, and complex cooling needs. AI servers can use 30 kW to more than 80 kW per rack, while many traditional data center racks operate below 15 kW. This change increases the need for modular power distribution, liquid cooling, and high-voltage switchgear.