2026-11-04
Why Are Data Centers Switching to Prefabricated Electrical Buildings?
Data centers are under pressure to increase power capacity while reducing construction time, operational risk, and carbon intensity. Traditional electrical rooms are often built sequentially on-site, where civil works, switchgear installation, cable routing, HVAC, fire protection, and commissioning compete for the same limited space. This creates schedule dependencies that can delay energization
2026-11-03
How Factory Assembly Improves Data Center E-House Quality Control
Pushen helps data center operators improve E-House quality control through a simple, repeatable factory-assembly process: freeze the design, control incoming materials, assemble modules in a controlled environment, inspect every critical connection, and complete documented FAT before shipment. By following these steps, businesses can reduce site rework, improve installation accuracy to 0.01 mm
2026-11-02
如何将 UPS 系统集成到数据中心 E-House 解决方案中
,将不间断电源集成到数据中心 E-House 中并不需要成为一个复杂的重新设计项目。 在本指南中,我将向您展示如何计算 UPS 要求、选择正确的拓扑、在预制电气外壳内预留空间、协调电池和冷却、完成工厂测试以及安全调试系统。 遵循这些
2026-10-30
选择合适的数据中心 E-House 供应商需要的不仅仅是比较产品价格。 采购团队必须确认技术合规性、工厂能力、交付可靠性、生命周期成本以及供应商管理从设计到调试的风险的能力。 本指南介绍了评估供应商和选择合格合作伙伴(例如
2026-10-29
室外数据中心 E-House 必须保护服务器、电池、开关设备和控制系统免受雨水、灰尘、高温和腐蚀。 可靠的设计结合了室外数据中心外壳、热管理和腐蚀防护。 正确的防风雨计划还使用 IP 等级、排水系统、绝缘材料和经过测试的 HVAC 设备。 这些措施有助于减少停机时间和维护